What's New
Construction of 250 KVA Sub-station along with DP Structure along with 11 KV one way RMU with Load Break Switch (LBS) & other accessories for Power Supply to the State food testing Laboratory (SFTL). Bhubaneswar (No- 646 Date- 15/02/2024)
Construction of 250 KVA Sub-station along with DP Structure along with 11 KV one way RMU with Load Break Switch (LBS) & other accessories for Power Supply to the State food testing Laboratory (SFTL). Bhubaneswar (No- 646 Date- 15/02/2024)
Published On - Feb 17, 2024